Power Plant Purging Aluminum Steam Blowing Target Plate Board

Hebei Zexu Pipe Manufacturing Co., Ltd.

Power Plant Purging Aluminum Steam Blowing Target Plate Board

Brand Name : Ze Xu

Model Number : According to the picture processing

Certification : CE API

Place of Origin : Cangzhou, Hebei

MOQ : Quantity(Pieces) 1 - 200 >200

Price : USD+US$10to US$1,00+PCS

Payment Terms : L/C, T/T

Supply Ability : 100000 Piece/Pieces per Week Forged Pipe Fittings

Delivery Time : 3-5 days

Packaging Details : Standard export packaging (outside the plywood box, inside the plastic cloth box)

size : According to the picture processing

model : According to the picture processing

standard : Processing according to drawings

Material : Aluminum copper

Origin : Cangzhou, China

use : Power plant experiment

Contact Now

Power plant purging aluminum target board supplier

After the pipeline has been purged qualified, other operations that affect the cleaning shall not be carried out.

1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections

2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of stolen goods on the inner surface of the pipeline. Liquid or gas pipelines with a nominal diameter greater than or equal to 600mm should be manually cleaned. Liquid pipelines with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.

3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system

4. The equipment and pipes that are not allowed to be purged are separated from the purging system.

5. After the pipeline is qualified for purging, in addition to the prescribed inspection and restoration work, no other work affecting the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in

Product Name
Steam purging copper target board
Material
copper
Size
Various models
Shape
rectangle

Power Plant Purging Aluminum Steam Blowing Target Plate BoardPower Plant Purging Aluminum Steam Blowing Target Plate Board


Product Tags:

purging aluminum steam blowing target plate

      

purging steam blowing target plate aluminum

      

purging steam blowing target plate

      
Buy cheap Power Plant Purging Aluminum Steam Blowing Target Plate Board product

Power Plant Purging Aluminum Steam Blowing Target Plate Board Images